1000部精品久久久久久久久,卫老日晕了淑蓉第八章芒果视频,久久精品麻豆日日躁夜夜躁,久久无码专区国产精品S,疯狂做受XXXX高潮欧美老妇

EN
The FGC system of the Xinxing Municipal Solid Waste Incineration Power Generation Project in Yunfu, Guangdong, undertaken by HEPT, has started construction
2025.05.30
The FGC system of the Xinxing Municipal Solid Waste Incineration Power Generation Project in Yunfu, Guangdong, undertaken by HEPT, has started construction since 20th. March 2025.
The total designed treatment capacity of household waste is 500 tons per day, equipped with a 1 × 500-TPD incinerator and a 1 × 12MW condensing steam turbine generator set. The FGC adopts the treatment process of "SNCR (not within the scope of this contract) + semi-dry desulfurization + dry powder injection system + activated carbon injection adsorption +SCR (without the scope of this contract) + bag filter + fly ash conveying, storage and stabilization", which is an EPC project by HEPT.
HEPT's references in Guangdong includes Dongguan Junye, Dongguan Jiulong, Shantou Chao Nan, Puning, Huiyang, Zhaoqing, Shantou Chenghai, Gaozhou, Zhongshan, Yunfu Xinxing, etc.
For more information, please click or scan below!
Follow us!